Sewer Reconstruction
Water Street
Exeter, New Hampshire


Project Description — Construction of approximately 900 linear feet of new 8" to 36" diameter sewer pipe on Water Street and cross-country portions in the vicinity of the Exeter Housing Authority, sewer manholes, installation of a new diversion structure to replace the existing Water Street diversion structure, abandonment of existing sewer pipe and manholes, temporary and permanent pavement trench patch, overlay of existing parking lots, handling of contaminated and potentially contaminated soils and groundwater, and appurtenant work.

Includes large volume bypass pumping and well point dewatering.